Platform Completed System Location Client
Gullfaks B 2008 Sewer Drain Above Galley Area Statoil/Bravida
Gullfaks B 2009 Sewer Drain Fitness Area Statoil/Bravida
Oseberg A 2010/2011 Sewer Drain Living Quarter Statoil/Aibel
Snorre A 2010/2011 Sewer Drain Under Living Quarter Statoil/Kaefer
Oseberg C 2011 Open Drain Helideck Helideck Statoil
Statfjord A 2011/2012 Ballast Water Utility Shaft Aibel/Statoil
Statfjord B 2012 Sea Water Utility Shaft Aibel
Veslefrikk B 2012 Open Drain Area C 64 Aibel/Statoil
Veslefrikk B 2012 Open Drain Area FB 72 Aibel/Statoil
Gullfaks A 2012 Flotation Tank Nozzles Area C07 Statoil
Snorre B 2013 Dumper Line Open Sea Aker Solutions/Statoil
Oseberg A 2013 Sea Water Tank Area M05 Aibel
Oseberg A 2013 Sewer Drain Living Quarter/Fase 2 Statoil/Aibel
Norne Ship 2012/2013 Dumper Line HPR-Trunk Statoil
Statfjord B 2012 Sea Water Area C07 Aibel
Statfjord C 2013 Camera Inspection Drain Under Living Quarter Aibel
Statfjord A 2013 Fire Water Area CD 11/Shaft Aibel
Snorre A 2013 Dumper Line Mud Under Drill Module Odfjell Drilling
Gullfaks A 2013 Oil Sump Tank  East Celler Deck Aker Solutions
Gullfaks A 2013 Separator Tank 44-VA01 Celler Deck Aker Solutions
Veslefrikk B 2013/2014 Open Drain to Sea Double Bottom Aibel
Haugesund 2014 Caissons OSC/Haugesund Aibel
Oseberg A 2015 Fire Fighting Foam System Helideck Statoil
Gullfaks C 2015 Separator Tank M25 Nozzles Statoil
Oseberg A 2015 ESA Tank A Nozzles Statoil
Gullfaks B 2015 Oil Foam Separator C04 Nozzles Statoil
Statfjord B 2015 Separator Tank C08 Spools Aibel
Spitsbergen 2015/2016 Pump-Firewater (super-duplex) Pump room Starboard/Port side Kværner/Transocean
Barents 2015/2016 Pump-Firewater (super-duplex) Pump room Starboard/Port side Kværner/Transocean
Oseberg C 2016 Oil-Sump-Tank/Wrapping In-deck Tank Statoil
Grane 2016 Caisson prod. Water 26” 40m Prefabrication at Kværner Egersund Statoil/Aker Solutions
Norwegian Navy 2016 Valves for firefighting Repair of flanges Cù/Ncl MRC Solberg & Andersen
Snorre B 2016 Open drain Innerlining of pipes P60 in double bottom Statoil
GFC 2016 Sewer in living-Quarter Site inspection of leaking sewage pipes Statoil
Troll B 2016 Open Drain Site Inspection of Open drain 57 system Reinertsen
OSA 2016 Duraseal Wrapping course Pipe leak repair/personnel training  cours Statoil
OSA 2016 VJ2000 ESB ESB Tank B Statoil
Troll B 2016 Duraseal Wrapping course Pipe leak repair/personnel training cours Statoil
OSØ 2016 Dumper Line Seawater Inlet  Cassion16″ Nozzle Statoil
GFC 2016/2017 Flotation Tank cell A Repair/lining of nozzles Statoil
GFC 2017 Oil Sump Tank 57- TB01V Nozzles on tank Statoil
OSA 2017 Flotation Tank TA 4400 1A/B/C Engineering / lamination of inside tanks Statoil
Troll B 2017 Open Drain Open Drain 57-system Troll / Reinertsen
Martin Linge del 1 2017 Seawater (titan spools) Titan spools 2” – 12” – 18” Total/Samsung Heavy Ind.
Kvitebjørn 2017 Drain LQ Repair Drain LQ (Bathroom) Statoil
Veslefrikk 2017 Duraseal Wrapping course Pipe leak repair/personnel training Statoil
GFB 2017 Flotation tank cell A Lining nozzles Statoil
GFB 2017 Jet Separator tank  44-CV22 Repair/lining and nozzles Statoil
GFB 2017 Prod. water tank Lining nozzles Statoil
GFB 2017 Oil Train Separator Lining nozzles Statoil
OSA / Feltsenter 2017 Flotation Tank TA 4400 1A Lamination of inside tank / Statoil
Heimdal 2017 Survey Offshore MEG. Vent line Statoil
Martin Linge del 2 2017 Seawater (titan spools) Titan spools 8” – 12” – 18” Total/Samsung Heavy Ind.
KviteBjørn 2017 Cutting overboard Shute Main deck Apply Sørco/Statoil
GFC 2017/2018 Open / Close Header C07-02 Module Support Frame Apply Sørco /Statoil
Oseberg D 2018 Chlorine tank:1774-VA Inside Lamination/lining/Nozzles Statoil
 Songa Encourage 2018 32 of Spools (211 of a bigger serial) Lining inside spools with Top-Hats Transocean
Martin Linge 2018 Seawater Titan spools Repair of re-designed spools Samsung Heavy Ind.
GFA 2018 Flotation tank Train-A Lamination/Lining of tank/equipment Statoil
Troll B ZMP 2018 Open drain Lining of Open drain system in module Aker Sol. Egersund
Draugen 2018 Produced Water Lining of 3 “ spool Norske Shell
OSA 2018 4th stage separator train A and B Lining of 18 nozzles 2” – 3” – 24” Equinor
Kårstø Raffineri 2018 Nozzle storage tank Lining of 2” nozzles Equinor
SFA 2018 Duraseal Wrapping course Pipe leak repair/personnel training Equinor
GFB 2018 Open Drain System M13D / M13M Equinor
Songa Enabler 2018 11 of Spools (211 of a bigger serial) Lining inside spools with Top-Hats Transocean
Troll C 2018 Produce water caisson Lining of inside 12” spools with Top-Hats Equinor
GFB 2018 Shale Shuter M14S/D24 Laminating of Shale Shuter KCA DEUTAG
Martin Linge 2018 8” Sewage and went spools on Hatch Lininating inside of spools with Top-Hats Rosenberg/WorleyParson
Songa Endurance 2018 56 of spools under construction Lining inside spools with Top-Hats Transocean
GFB 2018 Laminating of Seal pot 346 Area C005 Apply Sørco
GFB 2018 Tire implementation Shaft 13 LQ Apply Sørco
Songa Equinox 2018 56 spools under construction Lining inside spools with Top-Hats Transocean
Norne 2018 6×4¨spools (carbon steel) Lining inside spools with Top-Hats Aibel