Grane / Statoil  Execution in cooperation with Aker Solutions shipyard in Egersund.

Prefabrication 26 «Caisson + additional spools with special liner and epoxy, High Temp M. Temp: Produced water 80 ° C constant.

Periodically up to 99 ° C.

Liner is manufactured for temp. 140 ° C and special epoxy temp. 200 ° C

 

1     2

3     4

5     6

7     16

15     14

13     12

11     8

9                 10

Epoxy Textile Lining against Galvanic Corrosion on Fire Water Pumps Transocean Spitsbergen and Transocean Barents.

28 pcs. Super Duplex Spools in size DN 250 to DN 500 with 30 DN20 to DN 400 branches in 2015/16 with embodiment at Kværner Stord.
IMG_0884     IMG_1834

2000-01-28 02.55.52     2000-01-28 02.52.39

2000-01-25 20.05.26     2000-01-25 20.05.14

2000-01-25 20.04.13     IMG_20151209_113907

2000-01-25 20.01.28     2000-01-25 20.02.27

2000-01-25 20.00.46     1

2.     IMG_20151124_181519

IMG_20151124_181545     IMG_20160118_120529

 

Remediation of «Leakages in Safedeck foam beams» Oseberg A

Lining of 52pcs. DN70 on foam supply pipe, with total length of approx. 1370m.

Up drilling of approx. 1300 holes with dim. 6/10 / 18mm.

4 pcs. RHS150 with 2 × 45˚ bend, total 75m length, with drilling of 104 branches to deluge pipes, up drilling of 22 supply pipes and 52 access hatches.

22 supply pipes DN70 lines and attached with T-Hat over the raised face on the flange.

Repair of drain at approx. length 65m. width 18-20cm.

Work performed within 2.5 months. with full helicopter operation. 